Void-free support for everything buried

Close-up view of rippled sand dunes in low light, showing smooth, flowing shapes and fine lines on the sand surface.

STABILITY STARTS BELOW THE SURFACE

Engineered, load-bearing backfill for roads and pavements. Flowable placement without mechanical compaction reduces voids and settlement risks while accelerating construction.

SPEAK TO OUR ENGINEERS

Why FillWaves fits here

Conventional

  • Imported aggregates for the sub-base
  • Layered compaction with heavy equipment
  • Risk of gaps around buried utilities
  • Disruptive access for utility repairs
  • Water ingress can cause material washout
  • Risk of settlement and pavement damage
Red X Icon

FillWaves

  • Excavated sand reused as engineered fill
  • Flowable placement, no compaction
  • Uniform support around buried utilities
  • Re-excavatable where specified
  • Low-permeability engineered backfill
  • Helps reduce settlement risk
FillWaves Confirm Icon

FROM EXCAVATED SAND TO ENGINEERED ROAD BASE

Void-free support for everything buried

Flowable Backfill being poured

On-site production

SOIL & MIX DESIGN

Our engineers assess excavated sand and project requirements to develop a suitable FillWaves® mix. Cement, compound and water are proportioned to meet specified strength and bearing-capacity targets, with re-excavatability considered where required.

  • Project-specific mix design
  • Strength and CBR targets
  • Fresh or saline water

‍

ON-SITE PRODUCTION

Citrine™ mixing systems produce FillWaves® on-site using suitable excavated sand, cement, FillWaves® compound and water. Automated dosing and mixing create a homogeneous, flowable backfill, with batches documented for traceability. This reduces reliance on imported aggregates and transport.

  • Output: up to 40 m³/h
  • Automated dosing and mixing
  • Documented production batches

‍

PLACEMENT & CONTROL

FillWaves® is placed as a flowable, self-compacting layer without rolling or vibration. Our site team supervises placement, checks material consistency and coordinates testing under the project quality plan. Each completed section is documented before the next stage of road construction.

  • No mechanical compaction
  • Mix - Testing per quality plan
  • On-site supervision

‍

Filling a hole with flowable backfill

‍

Hole filled with flowable backfill

‍

Pipes being covered with flowable backfill
Black background with a triangular pattern made of small evenly spaced gray dots.

Our results

TESTED, VERIFIED, CERTIFIED

FillWaves® flowable fill was developed in a three-year test programme with the American University of Sharjah and the Dubai Municipality Central Laboratory. Compressive strength, bearing capacity, permeability and thermal behaviour were tested to recognised standards — with Gulf dune sand and with fresh and saline water. Strength development is complete at 56 days.

BEARING CAPACITY

FillWaves® provides load-bearing support for road and pavement construction. Its bearing capacity can be tailored through the mix design to meet project-specific structural requirements. Laboratory California Bearing Ratio (CBR) testing demonstrates its suitability for applications requiring stable, load-bearing backfill.

Maximum recorded CBR: 171.1%

Testing method: California Bearing Ratio (CBR)

Test condition: 10% cement mix, 7-day curing

‍

COMPRESSIVE STRENGTH

FillWaves® is engineered to achieve project-specific compressive strength through adaptable mix designs. By adjusting the cement content and material composition, the required structural performance can be achieved while considering future re-excavatability. Laboratory testing demonstrates strength development under different curing conditions, including fresh and saline water.

28-day compressive strength: 1.50–1.96 MPa (tested 10% cement mixes)

Testing standard: ASTM D4832

Testing periods: 7, 28 and 56 days

‍

FLOWABILITY

FillWaves® is engineered for high flowability, allowing the material to spread uniformly around pipes, cables and underground utilities, even in confined spaces. Its self-compacting properties eliminate the need for mechanical compaction, helping minimise voids and achieve consistent coverage throughout the backfill.

Flow spread: 500–700 mm

Testing standard: BS EN 12350-5

Mechanical compaction: Not required

‍

DRAG

Explore other application areas

Close-up of a pile of fine gray powder with small clumps and chunks scattered around.Piles of reddish-brown and pale excavated sand on a black background
Excavation Pits & Foundations
Start your project
Start your project
Start your project

TELL US ABOUT YOUR PROJECT

SEND MESSAGE
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
FillWaves Innovation
FillWaves Innovation
FillWaves Innovation
A burst of dry excavated sand against a white background

One Material. Many Solutions.

We transform your next infrastructure project from the ground up: turning excavated soil into engineered backfill, and delivering the planning, on-site production and quality control every project needs.