Thermal backfill for power cables, with laboratory-tested conductivity, moisture-retaining properties and self-compacting placement.
SPEAK TO OUR ENGINEERS
Our engineers assess excavated sand and review the cable project's thermal requirements against the laboratory-tested properties of FillWaves®. Results under saturated and dry conditions guide material suitability, while structural requirements and future maintenance access are considered before production.
Citrine™ mixing systems combine suitable excavated sand, cement, FillWaves® compound and water in controlled proportions. Automated dosing produces a homogeneous, flowable thermal backfill, while documented production batches support material consistency, quality assurance and traceability.
FillWaves® flows around buried cables and conduits without mechanical compaction, helping achieve uniform contact and minimise air gaps. Our engineers supervise placement, monitor material consistency and document installation quality in accordance with project specifications.





Our results
FillWaves® flowable fill was developed in a three-year test programme with the American University of Sharjah and the Dubai Municipality Central Laboratory. Compressive strength, bearing capacity, permeability and thermal behaviour were tested to recognised standards — with Gulf dune sand and with fresh and saline water. Strength development is complete at 56 days.
FillWaves® has been laboratory-tested for thermal conductivity under saturated and dry conditions. The results demonstrate its ability to transfer heat under different moisture conditions, supporting its suitability as thermal backfill around underground power cables.
Saturated conductivity: 1.20–1.45 W/(m·K)
Dry conductivity: 0.35–0.55 W/(m·K)
Testing: American University of Sharjah
FillWaves® demonstrates very low hydraulic conductivity, limiting water movement through the material. Its low permeability supports moisture management in underground installations, where moisture conditions play an important role in thermal performance.
Hydraulic conductivity: 4.1–6.7 × 10⁻⁹ m/s
Testing standard: DIN EN ISO 17892-11
Curing period: More than 28 days
FillWaves® is engineered for high flowability, allowing the material to surround buried cables, conduits and joints without mechanical compaction. Its self-compacting properties help minimise air gaps and provide uniform contact around underground infrastructure, supporting effective heat transfer.
Flow spread: 500–700 mm
Testing standard: BS EN 12350-5
Mechanical compaction: Not required



We transform your next infrastructure project from the ground up: turning excavated soil into engineered backfill, and delivering the planning, on-site production and quality control every project needs.