Re-excavatable flowable soil that flows around pipes, cables and services — produced on site from the excavated sand, placed without compaction.
SPEAK TO OUR ENGINEERS
Our engineers assess the excavated sand and project requirements to develop a suitable FillWaves® mix. Cement, FillWaves® compound and fresh or saline water are proportioned to achieve the specified strength and, where required, re-excavatability.
The Citrine™ system mixes suitable excavated sand with cement, FillWaves® compound and water. Automated dosing produces a homogeneous, flowable backfill in documented batches. On-site production reduces reliance on imported fill and can limit transport and material handling.
FillWaves® flows around pipes, cables and joints without mechanical compaction. Our engineers supervise placement and conduct regular soil testing to verify that the excavated material remains suitable for the approved mix design, supporting consistent quality throughout the backfilling process.





Our results
FillWaves® was developed through a three-year research and testing programme in collaboration with the American University of Sharjah and Dubai Municipality. Laboratory testing evaluated compressive strength, bearing capacity, hydraulic conductivity and thermal performance across different mix designs, including fresh- and saline-water conditions, using recognised testing standards.
FillWaves® is engineered for high flowability, allowing the material to spread uniformly around pipes, cables and underground utilities, even in confined spaces. With a specified flow spread of 500–700 mm, the self-compacting material requires no mechanical compaction, helping minimise voids and ensure consistent coverage throughout the backfill.
Flow spread: 500–700 mm
Testing standard: BS EN 12350-5
FillWaves® is engineered to achieve project-specific compressive strength through adaptable mix designs. Laboratory testing demonstrates strength development over 7, 28 and 56 days. By adjusting the material composition, structural stability can be balanced with re-excavatability for future maintenance.
Testing standard: ASTM D4832
Testing periods: 7, 28 and 56 days
Strength: Adjustable through mix design
FillWaves® can be engineered for future re-excavation, allowing access to buried pipes, cables and underground utilities for maintenance or replacement. By adjusting the mix design and compressive strength, the material provides the required structural support while maintaining the desired level of excavability.
Up to 300 kPa: Easy excavation by hand
300–800 kPa: Excavation with light equipment
Above 800 kPa: Mechanical excavation required



We transform your next infrastructure project from the ground up: turning excavated soil into engineered backfill, and delivering the planning, on-site production and quality control every project needs.