Void-free support for everything buried

Close-up view of rippled sand dunes in low light, showing smooth, flowing shapes and fine lines on the sand surface.

TURNING SAND INTO A WATER BARRIER

Low-permeability fill for landfill sealing, dams, reservoirs and structural backfill — produced on-site from excavated sand and placed without mechanical compaction.

SPEAK TO OUR ENGINEERS

Why FillWaves fits here

Conventional

  • Clay, bentonite or membranes imported
  • Excavated sand hauled away
  • Multiple sealing layers required
  • Each layer placed and compacted separately
  • Time-intensive rolling and compaction
  • Membranes can be damaged by stones
Red X Icon

FillWaves

  • Sealing layer made from excavated sand
  • Excavated sand reused on-site
  • Engineered as one poured layer
  • Continuous, self-compacting layer
  • Faster placement with one material
  • No membrane exposed to stone damage

‍

FillWaves Confirm Icon

FROM LOCAL SAND TO ENGINEERED SEALING

Void-free support for everything buried

Huge mass of flowable backfill poured

On-site production

SOIL & MIX DESIGN

Our engineers assess the excavated sand and project-specific sealing requirements to develop a suitable FillWaves® mix. Cement, FillWaves® compound and fresh or saline water are proportioned to achieve low hydraulic conductivity while meeting the required strength and workability specifications.

  • Soil suitability assessment
  • Project-specific permeability
  • Fresh or saline water

‍

 

Citrine™ mixing systems combine suitable excavated sand, cement, FillWaves® compound and water directly on-site. Automated dosing ensures controlled material proportions according to the project-specific mix design. The result is a homogeneous, flowable material engineered for low-permeability applications.

  • Automated dosing and mixing
  • Consistent material quality
  • Documented production batches
    ‍

PLACEMENT & CONTROL

FillWaves® is poured as a flowable, self-compacting layer without mechanical compaction. Our engineers supervise placement, monitor material consistency and coordinate quality testing against project specifications. Each section is documented to support controlled installation and the required low-permeability performance.

  • No mechanical compaction
  • Quality control and testing
  • On-site construction supervision

‍

flowable backfill being poured

‍

Huge site being covered with flowable backfill

‍

Drainage system being filled with flowable backfill
Black background with a triangular pattern made of small evenly spaced gray dots.

Our results

TESTED, VERIFIED, CERTIFIED

FillWaves® flowable fill was developed in a three-year test programme with the American University of Sharjah and the Dubai Municipality Central Laboratory. Compressive strength, bearing capacity, permeability and thermal behaviour were tested to recognised standards — with Gulf dune sand and with fresh and saline water. Strength development is complete at 56 days.

HYDRAULIC CONDUCTIVITY

FillWaves® demonstrates very low hydraulic conductivity, significantly limiting water movement through the material. Its homogeneous structure supports applications requiring seepage control and moisture protection, including underground infrastructure and engineered containment systems.

Hydraulic conductivity: 4.1–6.7 × 10⁻⁹ m/s

Testing standard: DIN EN ISO 17892-11

Curing period: More than 28 days

‍

SALINE ENVIRONMENT PERFORMANCE

FillWaves® has been laboratory-tested under highly saline conditions to evaluate its mechanical performance. Specimens prepared with seawater and cured in a high-salinity solution demonstrated continued compressive strength development, supporting the material's potential suitability for coastal and saline environments.

Mixing water salinity: 38 ppt

Curing solution salinity: 85 ppt

28-day compressive strength: 1.50 MPa

‍

DRAG

Explore other application areas

Close-up of a pile of fine gray powder with small clumps and chunks scattered around.Piles of reddish-brown and pale excavated sand on a black background
Roads & Pavements
Start your project
Start your project
Start your project

TELL US ABOUT YOUR PROJECT

SEND MESSAGE
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
FillWaves Innovation
FillWaves Innovation
FillWaves Innovation
A burst of dry excavated sand against a white background

One Material. Many Solutions.

We transform your next infrastructure project from the ground up: turning excavated soil into engineered backfill, and delivering the planning, on-site production and quality control every project needs.